Tag: carbonization heat recovery
-

Which engineering details decide the processing capacity of a waste heat recovery system?
The processing capacity of a waste heat recovery system depends on gas flow, temperature, fouling, pressure drop and the load profile of the host carbonization plant. The waste heat recovery system plant capacity starts with a measured heat balance rather than the rated area of a heat exchanger. The recovery loop must capture useful energy…
-

Which procurement model fits a turnkey waste heat recovery project?
Procurement decides how quickly a heat recovery loop starts saving fuel, and you, as a project investor or as an engineering manager, choose the contract model that matches your team and your risk appetite. A turnkey waste heat recovery project procurement model assigns design, supply, installation and commissioning to one supplier, so the interface risk…